Compound schedules combine two or more different simple schedules in
some way using the same reinforcer for the same behavior. There are many
possibilities; among those most often used are:
Alternative schedules – A type of compound schedule where two or more simple schedules are in effect and whichever schedule is completed first results in reinforcement
Conjunctive schedules – A complex schedule of reinforcement where two or more simple schedules are in effect independently of each other, and requirements on all of the simple schedules must be met for reinforcement.
Multiple schedules – Two or more schedules alternate over time, with a stimulus indicating which is in force. Reinforcement is delivered if the response requirement is met while a schedule is in effect.
Alternative schedules – A type of compound schedule where two or more simple schedules are in effect and whichever schedule is completed first results in reinforcement
Conjunctive schedules – A complex schedule of reinforcement where two or more simple schedules are in effect independently of each other, and requirements on all of the simple schedules must be met for reinforcement.
Multiple schedules – Two or more schedules alternate over time, with a stimulus indicating which is in force. Reinforcement is delivered if the response requirement is met while a schedule is in effect.
- Example: FR4 when given a whistle and FI6 when given a bell ring.
Mixed schedules – Either of two, or more, schedules may occur with no stimulus indicating which is in force. Reinforcement is delivered if the response requirement is met while a schedule is in effect.
- Example: FI6 and then VR3 without any stimulus warning of the change in schedule.
Concurrent schedules – A complex reinforcement procedure in which the participant can choose any one of two or more simple reinforcement schedules that are available simultaneously. Organisms are free to change back and forth between the response alternatives at any time.
- Real world example: changing channels on a television.
Concurrent-chain schedule of reinforcement – A complex reinforcement procedure in which the participant is permitted to choose during the first link which of several simple reinforcement schedules will be in effect in the second link. Once a choice has been made, the rejected alternatives become unavailable until the start of the next trial.
Interlocking schedules – A single schedule with two components where progress in one component affects progress in the other component. An interlocking FR60–FI120, for example, each response subtracts time from the interval component such that each response is "equal" to removing two seconds from the FI.
Chained schedules – Reinforcement occurs after two or more successive schedules have been completed, with a stimulus indicating when one schedule has been completed and the next has started
- Example: FR10 in a green light when completed it goes to a yellow light to indicate FR3, after it is completed it goes into red light to indicate VI6, etc. At the end of the chain, a reinforcer is given.
Tandem schedules – Reinforcement occurs when two or more successive schedule requirements have been completed, with no stimulus indicating when a schedule has been completed and the next has started.
- Example: VR10, after it is completed the schedule is changed without warning to FR10, after that it is changed without warning to FR16, etc. At the end of the series of schedules, a reinforcer is finally given.
Higher-order schedules – completion of one schedule is reinforced according to a second schedule; e.g. in FR2 (FI10 secs), two successive fixed interval schedules require completion before a response is reinforced.